Cloud migration for UK teams — pragmatic, low-risk, trackable

Lift, replatform, or refactor: we help businesses move workloads to the cloud with cost transparency, security safeguards, and minimal disruption.

Phone: +447856309214 • Based in Bristol, UK

Cloud migration strategy session

Why migrate with Inkpinedev

  • Clear TCO modelling and rightsizing to avoid runaway cloud bills.
  • Security-first migration with IAM hardening, secrets handling, and encrypted storage.
  • Phased delivery that preserves business continuity and rollback paths.
  • Operational handover and runbooks so your team owns the stack post-migration.
DevOps acceleration Data platform design
Cloud cost and architecture overview

Typical migration phases

Inventory, dependency mapping, security review, and cost baseline. We produce a migration plan with cutover windows, rollback criteria, and phased milestones.

Migrate a non-critical slice end-to-end to validate IaC, networking, and observability. Automate tests and rollback to confirm the process before wider rollout.

Execution of production cutovers with monitored rollouts, traffic shifting, and post-cutover performance tuning. Finalise runbooks and training for operations teams.

Pre-migration checklist

Applications
  • Dependency mapping
  • Stateful service plans
  • Compatibility matrix
Security & Compliance
  • IAM and network segmentation
  • Data residency checks (UK/GBR)
  • Encryption and key management
Operations
  • Observability and alerting
  • Runbooks & run-rate metrics
  • DR and recovery plans

Case studies

Retail migration case
Retail platform — replatform to managed services

Reduced infra costs by 28% and improved deployment times from days to hours using managed databases and container orchestration.

Integration notes
Data platform migration
Analytics platform — lift-and-shift with optimisation

Phased migration with a sandbox pilot preserved reporting SLAs while enabling faster pipeline scaling and controlled costs.

Data platform
Client avatar
Laura Mitchell
Head of Engineering, Retail

The migration plan was pragmatic and the pilot eliminated major surprises — excellent delivery from the Inkpinedev team.

Verified client
Client avatar
Mark Riley
CTO, Analytics

We kept reporting live during the cutover; the team handled rollback and cutover windows professionally.

Verified client

FAQ

Duration depends on complexity. Small apps can move in weeks; larger, stateful systems often require months with phased rollout and validation.

We model TCO and identify rightsizing opportunities. Initial costs can rise during migration but long-term optimisations typically reduce spend.

Yes — handover includes runbooks, run-rate dashboards, and knowledge-transfer sessions tailored to your operations team.

Ready to plan your migration?

Book a short assessment to surface risks, expected effort, and a phased plan with cost estimates and rollback criteria.

Book assessment Legal & SLA
34 Willow Lane, Bristol, BS8 1TR